VOL 13 | NUM 12 | 9 October 2026
|
|
|
|
|
|
|
|
CHILE | 28 September - 4 October 2026
|
|
|
|
Power Markets Weekly
is a brief weekly review of the electric market operation in Chile, Mexico, Iberia, France and Italy. If you are not a subscriber, please feel free to subscribe
here
|
|
|
|
|
|
DNV offers tools for Wholesale Market analysis and operation:
- DNV Power Analytics (DNV-PA) is our web-based platform that provides access to constantly updated long-term energy price forecasts.
- With a refined design and an improved user experience we are upgrading our digital services for our customers.
|
|
|
|
|
|
|
Back to 2006: Chile’s Marginal Costs Hit a 20-Year Low
|
|
|
|
The average price in Polpaico reached USD 19.0 This was 27% lower than last week and 42% lower compared to one year ago, marking its lowest weekly average since September 2006, when it reached USD 17.9/MWh.
|
|
Marginal cost evolution in Polpaico during past years
|
|
|
|
|
|
|
The generation mix presented moderate changes compared to the previous week. Regarding fossil-fueled generation, coal decreased its share by 1.1 pp, while gas decreased by 1.3 pp.
|
|
Regarding renewables, wind increased by 4.1 pp, whereas solar PV decreased 2.2 pp.
|
|
Peak demand in the system reached 11.7 GW at 2 pm on Monday. At that time, wind and solar generation jointly accounted for 56.9% of the generation mix.
|
|
BESS participation peaked at 10 pm on Tuesday, accounting for 26.7% of the generation mix
|
|
Generation Mix
|
|
|
|
|
Variation
|
|
|
|
|
Power range by energy sources (average prices)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Geothermal
|
|
Cogeneration
|
|
Biomass
|
|
Coal
|
|
|
Gas
|
|
Oil
|
|
BESS
|
|
Dam
|
|
|
Run-of-river
|
|
Wind
|
|
PV Solar
|
|
CSP
|
|
|
|
|
|
Prices kept a similar behaviour compared to last week, with the usual congestions in the southern areas:
|
- 500 kV Charrúa – Ancoa line congested every day of the week at non solar hours. This caused a price decoupling in the system, falling to USD 0/MWh in Charrúa to the south, due to high wind generation in the area. This extended to most of the weekend.
- 220 kV Tineo – Puerto Montt experienced a forced outage lasting approximately 29 minutes on Friday around noon. This failure caused congestion and price decoupling at Puerto Montt, forcing the operation of oil-fired Trapén and Degan power plants to meet demand and driving the weekly peak price to USD 386.9/MWh at 12 PM on Friday.
|
|
These congestions affected mostly the south-centre and south areas of the SEN, represented by Charrúa and Puerto Montt, respectively. The rest of the reference nodes of the SEN remained coupled.
|
|
In total, the number ofhours with zero prices was 60 for the reference nodes Crucero, Cardones, Pan de Azúcar, and Polpaico; 113 for Charrúa; and 111 for Puerto Montt.
|
|
Meanwhile, the CEN authorized the operation of the first stage of IEM’s conversion to natural gas, bringing 377.6 MW of capacity into operation under the new fuel configuration. The second stage of the conversion remains pending.
|
|
|
|
|
|
|
Crucero
USD 19.4/MWh
|
|
Cardones
USD 19.0/MWh
|
|
Pan de Azúcar
USD 18.8/MWh
|
|
|
|
|
Polpaico
USD 19.0/MWh
|
|
Charrúa
USD 8.7/MWh
|
|
Puerto Montt
USD 10.0/MWh
|
|
|
|
|
|
Solar and Wind production & BESS dispatch
|
|
Solar output decreased by 10.4% | 39.2 GWh compared to last week. Regarding the plant factor, the highest was 17.7% in Charrúa, while the lowest was 13.7% in Crucero. The system-wide solar plant factor was 15.0%.
|
|
Wind generation increased this week by 33% | 65.8 GWh relative to last week. The highest plant factor was 35.0% in Puerto Montt, while the lowest plant factor was 9.0% in Polpaico. The system-wide wind plant factor was 22.7%.
|
|
BESS showed an decrease in injection of 6.0% | 7.9 GWh, and a drop in charging by 5.0% | 8.0 GWh, relative to last week. Injections continue to occur predominantly before midnight, resulting in a significant reduction in BESS injections during the early morning hours.
|
|
This week, curtailment rates reached 15.5% | 49.53 GWh for wind and 13.6% | 64.9 GWh for solar. This resulted in a combined system-wide curtailment rate of 14.3%, which represents a decrease of 1.6 pp relative to last week.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Crucero
USD 2.8/MWh
|
|
Cardones
USD 2.2/MWh
|
|
Pan de Azúcar
USD 2.8/MWh
|
|
|
|
|
Polpaico
USD 2.3/MWh
|
|
Charrúa
USD 1.9/MWh
|
|
Puerto Montt
USD 4.1/MWh
|
|
|
|
|
Energy weighted average spot price using PV production by zone
|
|
|
|
|
|
|
Crucero
USD 16.4/MWh
|
|
Cardones
USD 17.8/MWh
|
|
Pan de Azúcar
USD 21.8/MWh
|
|
|
|
|
Polpaico
USD 23.6/MWh
|
|
Charrúa
USD 7.1/MWh
|
|
Puerto Montt
USD 7.1/MWh
|
|
|
|
|
Energy weighted average spot price using wind production by zone
|
|
|
|
BESS discharge capture price
|
|
|
|
|
Crucero
USD 29.7/MWh
|
|
Cardones
USD 29.7/MWh
|
|
Pan de Azúcar
USD 29.8/MWh
|
|
|
|
|
Polpaico
USD 31.6/MWh
|
|
Charrúa
USD 23.0/MWh
|
|
|
|
|
Energy weighted average spot price using BESS discharge by zone
|
|
|
|
BESS charge capture price
|
|
|
|
|
Crucero
USD 1.7/MWh
|
|
Cardones
USD 1.4/MWh
|
|
Pan de Azúcar
USD 1.2/MWh
|
|
|
|
|
Polpaico
USD 3.2/MWh
|
|
Charrúa
USD 5.6/MWh
|
|
|
|
|
Energy weighted average spot price using BESS charge (both from co-located power plant and from grid) by zone
|
|
|
|
|
|