VOL 12 | NUM 26 | 16 January 2026
|
|
|
|
|
|
|
|
CHILE | 5 - 11 January 2026
|
|
|
|
Power Markets Weekly
is a brief weekly review of the electric market operation in Chile, Mexico, Iberia, France and Italy. If you are not a subscriber, please feel free to subscribe
here
|
|
|
|
|
|
DNV offers tools for Wholesale Market analysis and operation:
- DNV Power Analytics (DNV-PA) is our web-based platform that provides access to constantly updated long-term energy price forecasts.
- With a refined design and an improved user experience we are upgrading our digital services for our customers.
|
|
|
|
|
|
|
A return to business with full week, rose the demand by 0.6% compared to last week
|
|
|
|
The average price in Polpaico was USD 36.5/MWh, which is 14.0% higher than last week but 12.4% lower compared to one year ago.
|
|
Marginal cost evolution in Polpaico during past years
|
|
|
|
|
|
|
A decrease in hydro share was observed despite a rise in dam by 0.4 pp, due to a fall in run-of-river by 1.1 pp.
|
|
Despite a 1.2 pp decrease in coal, thermals increased due to a 3.1 pp spike in gas and a 0.2 pp rise in oil
|
|
Finally, solar and wind shares fell by 0.6 pp and 0.8 pp, respectively.
|
|
Peak demand was 12.4 GW at 2 PM on Friday, with solar and wind accounted 74.6% of the generation. BESS participation had a peak at 11 PM on Sunday with 15.1%.
|
|
Generation Mix
|
|
|
|
|
Variation
|
|
|
|
|
Power range by energy sources (average prices)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Geothermal
|
|
Cogeneration
|
|
Biomass
|
|
Coal
|
|
|
Gas
|
|
Oil
|
|
BESS
|
|
Dam
|
|
|
Run-of-river
|
|
Wind
|
|
PV Solar
|
|
CSP
|
|
|
|
|
|
This week, the system recorded congestion in two main lines.
|
|
The 220 kV Lastarria – Ciruelos line was congested every day of the week, causing price decoupling in Puerto Montt. This congestion was observed at dawn from Monday to Saturday, and it was also recorded on Monday night.
|
|
On Monday, Wednesday and Thursday, the 500 kV Nueva Pan de Azúcar–Polpaico line experienced congestion. This occurred at dawn on Monday and Thursday, but on Wednesday it happened during solar hours. The congestion led to price decoupling from Polpaico to the south, however, Puerto Montt was not affected in these cases, as it had already been decoupled earlier due to congestion on the 220 kV Lastarria–Ciruelos line.
|
|
The peak price of the week was registered on Monday at 5 PM, when the oil power plant Trapén set the price in Puerto Montt at USD 253.2/MWh. At the same hour, Polpaico and Charrúa were below USD 52/MWh, while Crucero, Diego de Almagro and Pan de Azúcar registered zero prices.
|
|
|
|
|
|
|
Crucero
USD 30.0/MWh
|
|
D. de Almagro
USD 30.3/MWh
|
|
Pan de Azúcar
USD 30.5/MWh
|
|
|
|
|
Polpaico
USD 34.8/MWh
|
|
Charrúa
USD 34.3/MWh
|
|
Puerto Montt
USD 126.8/MWh
|
|
|
|
|
|
Solar and Wind production & BESS dispatch
|
|
Solar injection increased its system wide plant factor by 0.4 pp compared to last week, reaching 26.6%. The highest plant factor was 30.0% in… Puerto Montt! while the lowest was in Pan de Azúcar with 22.7%.
|
|
Wind injection increased its system plant factor by 1.4 pp compared to last week, reaching 19.0%. The highest plant factor was in Charrúa with 26.6%, while the lowest was in Polpaico with 6.9%.
|
|
The total BESS discharge reached 56.9 GWh, which is 5.1 GWh lower than the injection recorded last week. Crucero recorded the highest total injection with 48.5 GWh, while Pan de Azúcar recorded the lowest at 40 MWh.
|
|
The combined curtailment rate for solar and wind generation declined by -1.7 pp compared to last week, reaching 19.4%. Solar curtailment reached 20.8% | 131.1 GWh while wind curtailment was 18.9% | 51.8 GWh.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Crucero
USD 1.4/MWh
|
|
D. de Almagro
USD 1.9/MWh
|
|
Pan de Azúcar
USD 1.6/MWh
|
|
|
|
|
Polpaico
USD 8.3/MWh
|
|
Charrúa
USD 9.9/MWh
|
|
Puerto Montt
USD 164.0/MWh
|
|
|
|
|
Energy weighted average spot price using PV production by zone
|
|
|
|
|
|
|
Crucero
USD 22.7/MWh
|
|
D. de Almagro
USD 33.0/MWh
|
|
Pan de Azúcar
USD 34.7/MWh
|
|
|
|
|
Polpaico
USD 26.1/MWh
|
|
Charrúa
USD 40.2/MWh
|
|
Puerto Montt
USD 100.2/MWh
|
|
|
|
|
Energy weighted average spot price using wind production by zone
|
|
|
|
BESS discharge capture price
|
|
|
|
|
Crucero
USD 58.3/MWh
|
|
D. de Almagro
USD 60.3/MWh
|
|
Pan de Azúcar
USD 66.3/MWh
|
|
|
|
|
Polpaico
USD 59.3/MWh
|
|
Charrúa
USD 58.1/MWh
|
|
|
|
|
Energy weighted average spot price using BESS injection by zone
|
|
|
|
|
|
DNV, Magdalena 181, Las Condes, Santiago, Chile
|
|
|
|
|
|
|