|
|
VOL 11 | NUM 47 | 13 June 2025
|
|
|
|
Power Markets Weekly
is a brief weekly review of the electric market operation in Chile, Mexico, Iberia, France and Italy. If you are not a subscriber, please feel free to subscribe
here
|
|
|
|
|
|
DNV offers tools for Wholesale Market analysis and operation:
- DNV Power Analytics (DNV-PA) is our web-based platform that provides access to constantly updated long-term energy price forecasts.
- With a refined design and an improved user experience we are upgrading our digital services for our customers.
|
|
|
|
|
|
|
Notable increase in the share of gas compensates for the low availability of renewables.
|
|
|
|
This week’s average marginal cost in Polpaico was USD 68.6/MWh, which is 18% higher than last week and 13% higher compared to one year ago.
|
|
Marginal cost evolution in Polpaico during past years
|
|
|
|
|
|
|
A decrease in demand was accompanied with a reduction in the participation of renewables and a significant increase of thermal’s share.
|
|
On the one hand, renewables had decreases in run-of-river by 1.6 pp., wind by 3.8 pp. and solar by 1.6 pp., even though, there were increases in dam and biomass participation by 1.1 pp. and 0.4 pp., respectively.
|
|
On the other hand, thermals had a huge increase in their share led by a 7.1 pp. of gas. However, there were also decreases in coal by 0.5 pp. and oil 0.4 pp.
|
|
BESS injections had a decrease in their participation by 0.3 pp.
|
|
Peak demand reached 11.3 GWh/h on Tuesday at 11 AM with renewables covering 70.4% of the load. The 3 main contributing techs were solar with 40.4%, dam with 11.0% and run-of-river with 9.6%.
|
|
Generation Mix
|
|
|
|
|
Variation
|
|
|
|
|
Power range by energy sources (average prices)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Geothermal
|
|
Cogeneration
|
|
Biomass
|
|
Coal
|
|
|
Gas
|
|
Oil
|
|
BESS
|
|
Dam
|
|
|
Run-of-river
|
|
Wind
|
|
PV Solar
|
|
CSP
|
|
|
|
|
|
The 220 kV line Lastarria – Ciruelos decoupled Puerto Montt from Monday night until early Tuesday morning.
|
|
The 500 kV line Nueva Pan de Azúcar – Polpaico remained congested from Monday to Saturday during solar hours, decoupling the system from Pan de Azúcar to the north.
|
|
The 500 kV line Alto Jahuel – Lo Aguirre was congested on Saturday and Sunday during solar hours, decoupling the system from Charrúa to the south.
|
|
The peak marginal cost was registered in Puerto Montt on Friday at 11 AM, reaching USD 159.6/MWh. At that time, thermals covered 30.6% of the generation: gas with 21.8%, coal with 8.2%, and oil with 0.6%.
|
|
|
|
|
|
|
Crucero
USD 50.6/MWh
|
|
D. de Almagro
USD 50.9/MWh
|
|
Pan de Azúcar
USD 52.2/MWh
|
|
|
|
|
Polpaico
USD 68.6/MWh
|
|
Charrúa
USD 73.1/MWh
|
|
Puerto Montt
USD 73.4/MWh
|
|
|
|
|
|
Solar and Wind production & BESS dispatch
|
|
Solar generation reached 277.5 GWh with an average plant factor of 14.8%. The highest plant factor was registered in Crucero (18.0%), while the lowest was in Puerto Montt (3.4%).
|
|
Wind generation reached 203.0 GWh with an average plant factor of 20.2%. The highest plant factor was registered in Diego de Almagro (30.7%), while the lowest was in Polpaico (7.7%).
|
|
BESS injections reached 30.1 GWh with an average plant factor of 13.1%. The highest plant factor was registered in Crucero (15.6%), while the lowest was in Polpaico (4.4%).
|
|
On Wednesday and Thursday mornings, the usual BESS injections weren’t registered.
|
|
This week’s curtailment rate was 3.4% for wind and 9.7% for solar, reaching an average curtailment rate of 7.1%, which is higher than last week by 1.1 pp.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Crucero
USD 15.7/MWh
|
|
D. de Almagro
USD 14.3/MWh
|
|
Pan de Azúcar
USD 13.8/MWh
|
|
|
|
|
Polpaico
USD 46.7/MWh
|
|
Charrúa
USD 68.7/MWh
|
|
Puerto Montt
USD 73.7/MWh
|
|
|
|
|
Energy weighted average spot price using PV production by zone
|
|
|
|
|
|
|
Crucero
USD 51.4/MWh
|
|
D. de Almagro
USD 51.5/MWh
|
|
Pan de Azúcar
USD 46.9/MWh
|
|
|
|
|
Polpaico
USD 66.4/MWh
|
|
Charrúa
USD 68.0/MWh
|
|
Puerto Montt
USD 64.9/MWh
|
|
|
|
|
Energy weighted average spot price using wind production by zone
|
|
|
|
BESS discharge capture price
|
|
|
|
|
Crucero
USD 77.2/MWh
|
|
D. de Almagro
USD 66.7/MWh
|
|
Pan de Azúcar
USD 87.0/MWh
|
|
|
|
|
Polpaico
USD 84.0/MWh
|
|
Charrúa
USD 83.2/MWh
|
|
|
|
|
Energy weighted average spot price using BESS injection by zone
|
|
|
|
|
|
DNV, Magdalena 181, Las Condes, Santiago, Chile
|
|
|
|
|
|
|