Sunday's price Spike due to generation failures in Crucero.
|
|
|
|
The average price in Polpaico was USD 66.0/MWh, 1% lower than last week and 22% lower compared to one year ago.
|
|
Marginal cost evolution in Polpaico during past years
|
|
|
|
|
|
|
This week, renewables remained stable its participation, with some minor variation in hydro due to operational constraints:: run of river decreased by 0.7 pp. and dam by 0.2 pp. These variations led to an increase in coal by 0.2 pp. and gas by 0.7 pp.
|
|
The system’s maximum demand reached 11 GW on Saturday at 2 PM, with wind and solar contributing 53.6% of the generation. The highest wind and solar participation occurred on Friday at 3 PM, covering 65.0% of the demand.
|
|
Generation Mix
|
|
|
|
|
Variation
|
|
|
|
|
Power range by energy sources (average prices)
|
|
|
|
|
|
|
|
|
|
|
|
Geothermal
|
|
Cogeneration
|
|
Biomass
|
|
Coal
|
|
|
Gas
|
|
Oil
|
|
BESS
|
|
Dam
|
|
|
Run-of-river
|
|
Wind
|
|
PV Solar
|
|
CSP
|
|
|
|
|
|
This week, the system experienced frequent decoupling events, occurring almost daily.
The decoupling was primarily caused by congestion on the following transmission lines:
|
- 220 kV María Elena – Kimal
- 500 kV Nueva Pan de Azúcar – Polpaico
- 220 kV Lastarria – Ciruelos
- 220 kV Charrúa – Santa Clara
|
|
During the week, specific failures were observed in combined cycle power plants, which required the operation of gas through open cycle plants.
|
|
Additionally, a significant event occurred on Sunday morning, leading to a price spike in Crucero, where prices peaked at USD 409.8/MWh.
This was triggered by failures during the startup process of the Ujina, Atacama, and Tocopilla power plants (all gas plants), that lead to the use of diesel and caused the decoupling of the following lines:
|
- 500 kV Changos – Kimal
- 220 kV Kapatur – O'Higgins
- 220 kV Kapatur – Laberinto
|
|
|
|
|
|
|
Crucero
USD 60.3/MWh
|
|
D. de Almagro
USD 55.9/MWh
|
|
Pan de Azúcar
USD 56.5/MWh
|
|
|
|
|
Polpaico
USD 66.0/MWh
|
|
Charrúa
USD 64.1/MWh
|
|
Puerto Montt
USD 54.3/MWh
|
|
|
|
|
|
Solar and Wind production & BESS dispatch
|
|
Solar generation was 275.7 GWh, with an average plant factor of 14.8%. The lowest plant factor was in Puerto Montt (6.1%) and the highest was in Crucero (19.3%).
|
|
Wind generation was 185.5 GWh, with an average plant factor of 18.5%. The lowest plan factor was in Charrúa (12.1%) and the highest was in Puerto Montt (46.4%).
|
|
Finally, BESS dispatch was 32.1 GWh, with an average plant factor of 15.3%. The lowest plant factor was Pan de Azúcar with 5.1% and the highest in Crucero with 17.1%.
|
|
This week’s curtailment rate was 11.6% for wind and 4% for solar, reaching an average curtailment rate of 9.7% (lower to last week’s average curtailment rate).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Crucero
USD 26.3/MWh
|
|
D. de Almagro
USD 25.7/MWh
|
|
Pan de Azúcar
USD 27.5/MWh
|
|
|
|
|
Polpaico
USD 49.3/MWh
|
|
Charrúa
USD 50.7/MWh
|
|
Puerto Montt
USD 56.9/MWh
|
|
|
|
|
Energy weighted average spot price using PV production by zone
|
|
|
|
|
|
|
Crucero
USD 59.4/MWh
|
|
D. de Almagro
USD 56.0/MWh
|
|
Pan de Azúcar
USD 54.5/MWh
|
|
|
|
|
Polpaico
USD 63.2/MWh
|
|
Charrúa
USD 63.2/MWh
|
|
Puerto Montt
USD 50.6/MWh
|
|
|
|
|
Energy weighted average spot price using wind production by zone
|
|
|
|
BESS discharge capture price
|
|
|
|
|
Crucero
USD 75.9/MWh
|
|
D. de Almagro
USD 67.8/MWh
|
|
Pan de Azúcar
USD 79.2/MWh
|
|
|
|
|
Polpaico
USD 80.5/MWh
|
|
Charrúa
USD 71.2/MWh
|
|
|
|
|
Energy weighted average spot price using BESS injection by zone
|
|
|
|
|
|